To see more CLICK HERE
Wednesday, July 14, 2010
So...where do the buildings go??
I have been toying around with some structures that I had picked up over the last year. I won't get really serious until I have everyhting running but it is fun to dream. Here is the current mock up...
Tuesday, July 13, 2010
DONE...
...well this part of the REMOND SHELF is done
I was able to get the last tortoise wired in today which completes the track and wiring for the first section of layout. I will be moving on to the staging yard and getting that completed in the following weeks. Staging will not be anything fancy just walthers switches and atlas flex track.
I was able to get the last tortoise wired in today which completes the track and wiring for the first section of layout. I will be moving on to the staging yard and getting that completed in the following weeks. Staging will not be anything fancy just walthers switches and atlas flex track.
Saturday, July 10, 2010
Setting the Scene
I took a little break from re-building switches and laying track to see what a train would look like on the layout. I dug my SP&S 301 and a handful of cars out and placed them on the layout. Nothing spectacular but it sure gives me motivation to get the rest of the track work and wiring done so I can start testing operations.
Subscribe to:
Posts (Atom)