Sunday, August 29, 2010

Inside and Out

Had a very productive week and was able to start tackeling theinterior of Tum-A-Lum lumber and I also got the rest of  the benchwork up for the Redmond shelf layout!!!



More photos on the Redmond Shelf page and the Structures page

Sunday, August 15, 2010

Tum-A-Lum....Bless you....

So while waiting on some help with getting the benchwork up and some other projects I need to complete before I get back to construction I decided to play around with my next industry. I have chosen a small lumber dealer, specifically the Tum-A-Lum Lumber company. This is a real company with stores in Oregon and Washington. They are mainly lumber yards but they also have a hardware store section to be a full line store. Although the Tum-A-Lum in Redmond was not directly rail served I have moved them track side.
For more pictures please check out the Structures

Sunday, August 1, 2010

Staging...

I was able to complete my staging yard today and verify that it is fully functional. With this completed I can then move on to the rest of benchwork and get the whole layout operational. I have also been working on some buildings and a little scenery. To see the rest of the pictures check REMOND SHELF page.