I have a wedge shaped piece on my layout and was trying to figure out what to do with it. I combed through some photos and was unable to find exactly what was in that area in the 60's so I decided to do a little freelancing. I wanted to have some sort of auto repair or shop and decided to model a transmission and motor rebuilding shop. This way I can have both small and large vehicles being worked on in the same place. This will also give me a reason to buy more vehicles....
Tuesday, June 28, 2011
Sunday, June 19, 2011
Three are better then one...
Thanks to a marathon work session I was able to complete the other two bridges for the Greenwood Underpass. I still need to finish the decking in a few spots and also the handrails on the far side. Once that is finished I am going to build the permanent base and start working on the road, abutments and other assorted roadway parts.
Monday, June 13, 2011
Brooks-Scanlon Lumber Company Spur
I had some time and was able to put in the Brooks-Scanlon spur. I am not sure how many boxcars will fit on the track, but it will be quite a few. Although it is just one track it will be serving three different parts of the mill and may pose a challenge for switching.
I need to finish weathering the track and ties and then will be moving on to wiring.
I need to finish weathering the track and ties and then will be moving on to wiring.
Sunday, June 12, 2011
Track work begins!!!
I was able to get my track work started this weekend and I think it is going well. I am using all code 83 rail for this layout with Micro Engineering flex on the main and CVMW tie strips in the auxiliary tracks. I now just have to wait for ME to produce more #6 switches so I can continue working around the layout.
More photos of my progress in Bend Shelf Layout section.
More photos of my progress in Bend Shelf Layout section.
Monday, May 30, 2011
1 of 3....
With the long weekend and a marathon work session I was able to get the first of the three bridges completed for the Greenwood Underpass. I have already started to gather the necessary parts fot the other two bridges and will be starting construction soon.
Saturday, May 28, 2011
New lights
I have been working on the layout but it has been mostly boring stuff like supports and other stuff not worth taking pictures of. I was able to put up 4 new 4ft single bulb fluorescent lights, I have a plan to put up four more in the near future. Having more lights has really changed the look of the room for the better.
Friday, May 6, 2011
Roadbed begins
With the subroadbed completed I started laying cork at a moderate pace. I still have a bunch of work before I can lay track but I am getting closer. I am using HO cork for mainlines and part of the siding the rest will be N scale cork.
Follow the progress of the Bend shelf layout HERE
Follow the progress of the Bend shelf layout HERE
Subscribe to:
Posts (Atom)