Friday, October 1, 2010

We have the power....

I completed wiring the track this week on the Redmond Shelf Layout!!!!
The Redmond switcher is setting a string of cars into the Pondersoa Moulding lead leaving the caboose on the mainline.













I was also able to bring a bunch of cars from out of their storage cases and place them on the layout for some operational testing. Goals for this week are to wire 3 toroise switch machines with dual DPDT switches, this should be fun...

No comments:

Post a Comment